top of page
Case studies
Image-empty-state.png

Successful delivery of two Ø40m thickeners

In this extensive project, Alteco System has been responsible for the innovative general contractor, Vinabs,'s engineering work, which included process design, dimensioning, construction, component selection, procurement and commissioning of two complete thickener systems with LKAB as the end customer.

2019-2021

Project period:

Image-empty-state.png

Robust belt conveyor

Alteco System, together with the customer LKAB, has designed a 138-meter-long belt conveyor for one of LKAB's pellet plants in Malmberget. Alteco System has been technically responsible for the entire project, from preliminary design to completed commissioning at a satisfied customer.

2019-2021

Project period:

Image-empty-state.png

Innovative rock breaker

Alteco System has designed several equipments on a BTI shot blasting rig for the customer NMV Kiruna. We have been responsible for a number of components all the way from idea to manufacturing and assembly of the finished product.

2019

Project period:

Image-empty-state.png

Optimized handing system for milling bodies

Alteco has, together with the customer, redesigned and optimized the handling process for grinding bodies for all of the ball mills at Luossavaara-Kirunavaara Aktiebolag's (LKAB) in Malmberget. A total of 17 horizontal ball mills have been optimized with regard to grinding body feeding systems.

2018-2020

Project period:

Image-empty-state.png

Mineral process optimization

Alteco has conducted a feasibility study on how the process in pellet plants can be optimized to minimize production disruptions that occur due to steel fiber reinforcement that is inadvertently included in the process.

2018-2019

Project period:

bottom of page